Pantanal Jaguar Expeditions logo
 Welcome
 Your Guide
 The Pantanal
 Cuiabá
 Chapada dos Guimarães
 Nobres
 The Park Road
 Lodges
 Videos
 Pantanal Ecological Tours
   A Day in the Pantanal
   4 Days and 3 Nights
 Special Jaguar Tours
   3d2n Jaguar Tour
   5d4n Jaguar Tour
 Fishing Tours
 Pantanal Plant Life
 Pantanal Wildlife
 A-Z English-Latin Bird List
 A-Z Latin-English Bird List
 Multilingual Bird Glossary
 Multilingual Animal Glossary
 FAQ
 Brazil Facts
 Elionil's Photos
 Tour Prices
 Contact Us
Pantanal Jaguar Expeditions

THE PARK ROAD

Park entrance
 
The Park Road, also called the Transpantaneira, was constructed in the 1970s by the military government at the same time as it constructed the Transamazon Highway and the BR-163 interstate, which connects Cuiabá to Santarem in Pará State. The Transpantaneira Highway connects Poconé in Mato Grosso to Corumbá in Mato Grosso do Sul.

road sign


It was originally built to serve as a boiadeira, a road for transporting local cattle to the meat-processing plants in the South, thus eliminating the traditional great cattle marches, known to be carried out for centuries. In this era, the Pantanal was the largest producer of cattle in the country achieving quantities of up to one million head.

road sign


The project was conceived by Dr. Gabriel Muller, an agronomist with a deep knowledge of the Pantanal region. At that time he was also the director of CODEMAT (Company for the Development of Mato Grosso). A businessman, who was also an owner of a large area of land in the Pantanal and well connected to the military government, also encouraged the construction of this road. Taking advantage of the lack of environmental controls, he built a large fazenda with embankments made by large machines and altered the course of rivers to his own benefit, while harming innumerable Pantaneira families.

road sign


In 1977, when the territory of Mato Grosso was divided into two states, thus creating Mato Grosso do Sul, the highway had already reached the banks of the Cuiabá River, 145 km from the south to Poconé as it remains today. With 122 bridges for the run-off during the floods, it does not follow the normal rules of existent roads, which are built on the highest parts of the terrain.

road sign


The road was constructed by creating borrowing ditches along the sides; earth was removed to increase the elevation of the road. These ditches accumulate water, even in the dry season, transforming themselves into fish reserves and attracting birds, reptiles and other animals.

road sign


The best time of year to visit is May to October when the rains have stopped and the flora and fauna are exuberant. From November to April, during the flood season, it is more difficult to access the side roads of the Transpantaneira, and while there is less fauna to be seen, the aquatic flora is splendid.
Transpantaneira road from above
 
First six photos copyright Angela Fairbank
The remaining photo has been supplied by Elionil Silva
and is not known to be subject to copyright.
Website © Pantanal Jaguar Expeditions 2009-2012.
Contact the webmaster for permission to use
any of the copyrighted photographs appearing on this page.

Webmaster: Angela Fairbank Angela Fairbank, Webmaster
This page was last modified on 5 January 2012.

Find us on

Valid HTML 4.01!Valid CSS!